Changes to the server made, being made, or to be made.
2/2/2011: Another 12GB of ram installed, for a total of 24GB. 12GB is being used as a ramdisk for storing the PvP map and server files.
1/16/2011: Server class NIC installed!
1/11/2011: Intel Server-class Gigabit Network card on the way!
12/25/2010: New i7, RAM, Mobo installed!
12/21/2010: 12GB DDR3, i7-950, and Gigabyte i7 Mobo on the way!
12/17/2010: 4GB of ram installed, total server ram 12GB. 5GB to each server, then 2GB for system overhead and MySQL activity.
12/9/2010: Corsair 650W PSU, cable modem installed, 50/10 ISP plan up and running.
12/8/2010: Another 4GB on the way, to bring the total up to 12GB!
12/5/2010: Corsair 650W PSU and Docsys 3.0 cable modem on the way. Will upgrade to 50/10 ISP plan as soon as cable modem arrives!
10/27/2010: 4GB ram and X4 with Zalman 9500, for a total of 8GB and X4 clocked to 3.6ghz!
10/21/2010: Changed DNS name for server IP to play.minecraft.cc
10/19/2010: 60GB SSD, X2, AM2+ motherboard, and Server 2008 64-bit all installed. 5GB RAM total now on the server.
10/13/2010: 60GB OCZ Vertex SSD on order
10/12/2010: Put ASUS AM2+ motherboard on order
10/12/2010: Added 2GB of ram for a total of 4GB
10/08/2010: Gave VIP's the ability to warp
10/06/2010: Fixed buckets
10/04/2010: Added 2GB of ram
09/XX/2010: Added Hey0's mod
2/2/2011: Another 12GB of ram installed, for a total of 24GB. 12GB is being used as a ramdisk for storing the PvP map and server files.
1/16/2011: Server class NIC installed!
1/11/2011: Intel Server-class Gigabit Network card on the way!
12/25/2010: New i7, RAM, Mobo installed!
12/21/2010: 12GB DDR3, i7-950, and Gigabyte i7 Mobo on the way!
12/17/2010: 4GB of ram installed, total server ram 12GB. 5GB to each server, then 2GB for system overhead and MySQL activity.
12/9/2010: Corsair 650W PSU, cable modem installed, 50/10 ISP plan up and running.
12/8/2010: Another 4GB on the way, to bring the total up to 12GB!
12/5/2010: Corsair 650W PSU and Docsys 3.0 cable modem on the way. Will upgrade to 50/10 ISP plan as soon as cable modem arrives!
10/27/2010: 4GB ram and X4 with Zalman 9500, for a total of 8GB and X4 clocked to 3.6ghz!
10/21/2010: Changed DNS name for server IP to play.minecraft.cc
10/19/2010: 60GB SSD, X2, AM2+ motherboard, and Server 2008 64-bit all installed. 5GB RAM total now on the server.
10/13/2010: 60GB OCZ Vertex SSD on order
10/12/2010: Put ASUS AM2+ motherboard on order
10/12/2010: Added 2GB of ram for a total of 4GB
10/08/2010: Gave VIP's the ability to warp
10/06/2010: Fixed buckets
10/04/2010: Added 2GB of ram
09/XX/2010: Added Hey0's mod